english german 

Our wood looks good although it’s not in quite the right spot yet.  For now, it will have to stay in the driveway.

First we have to prepare the foundation for the deck.

After long talks and studying all the possibilities, we decided to go with a point foundation.  We marked the postitions for the first holes with flour.

We drilled the first row with a manuel hole driller but after taking an hour to get  just the right depth and level, we decided if we want to get this deck done this spring we would have to rent a better drill.

It went much faster and was much more fun with the electric drill.

This is how it looked after the first day.