We decided we had to finish today what we didn’t finish yesterday which meant filling the pipes with cement from 8am  to 1 pm.

Then we had 8 big bags (8 tons) of sand and pebbles delivered which needed to be spread out between the pipes.

After the sand was down,  Kimberly spread out the fleece and cut it to fit around the pipes. Then she spread the pebbles on top.

Thanks to everyone’s help we were able to get the last of the rocks off the street and into the deck area.